Contract Package |
Company Consortium which the contract package has been awarded |
1. Design and Construction of Civil Works and Ventilation & Air Conditioning Works for Metro Corridor (Vishwa Vidyalaya ISBT section)
(Contract Package MC1A) |
- Kumagai Gumi Co. Ltd. Japan
- Skanska International Civil Engineering
- AB, Sweden
- Hindustan Construction Co. Ltd. India
- Itochu Corporation, Japan |
2. Design and Construction Civil Works and Ventilation Air Conditioning for Metro Corridor (ISBT – Central Secretariat)
(Contract Package MC1B) |
- Dyckerhoff & Windmann AG, Germany
- Shimizu Corporation, Japan.
- Larsen & Turbo Ltd., India
- Samsung Corporation, Korea
- IRCON International Ltd., India |
3. Design, Manufacture, Supply and Commissioning of Rolling Stock for Metro & Rail Corridors
(Contract Package RS1) |
- Mitsubishi Corporation, Japan
- KOROS, Korea
- Mitsubishi Electric Corporation, Japan |
4. Signalling / Train Control and Communication System for Metro & Rail Corridors
(Contract Package SYS1) |
- Alstom Transport Ltd., India
- Alstom Transport SA, France
- Alcatel Portugal SA
- Sumitomo Corporation, Japan |
5. Traction Power, Power Distribution and SCADA System for Metro Corridor
(Contract Package SYS2) |
- IRCON International Ltd. (India)
- Corba, Spain
- ELIOP, Spain |
6. Automatic Fare Collection System for Metro & Rail Corridors.
(Contract Package SYS4) |
- Alcatel CGA Transport, France |
7. Supply, Installation, Testing and Commission of Tractions Electrification, Power Supply, Power Distribution and SCADA System for Rail Corridor
(Contract Package RC-7A) |
- ABB Ltd., India
- Best & Crompton
- Engineering Ltd., India |
8. Supply, Installation, Testing and Commissioning of ballast less tract for Rail Corridor
(Contract Package RC3) |
- IRCON International Ltd. (India)
- MVM Rail Pty., Australia |